Supervision of borehole drilling, constçuction and pumping test works continued for the period from 23tu June to 22 July 1992. A total of four boreholes were drilled whilst two boreholes were pump tested. Construction was completed for borehole 7051 with slotted casing wrapped with geotextile material.