Skip to main content

Groundwater Potential Survey Toteng/Sehitwa TGLP Area TB 10/2/5/90-91; Tenth Month-End Report- By Geoflux (Pty) Ltd, 23 June - 22 July 1992

Price
BWP280.00

Supervision of borehole drilling, constçuction and pumping test works continued for the period from 23tu June to 22 July 1992. A total of four boreholes were drilled whilst two boreholes were pump tested. Construction was completed for borehole 7051 with slotted casing wrapped with geotextile material.

Product Type