Skip to main content

Tati River: Dam Site 9 Feasibility/Detailed Design Study; Feasibility Report, Volume 1- By Department of Water Affairs in Association with Knight Piesold- Botswana, November 1997

Price
BWP140.00

The objective of the study was to investigate the feasibility of constructing a dam at Site 9 in the Tati river 30 km south of Masunga Village in order to augment the water supplies to Masunga and surrounding villages in the North East and Central districts. The data and results of the engineering feasibility study are presented in this report.

Product Type