
This report summarises progress on the environmental impact assessment (EIA) study activities during month 1. As stipulated in the TORs, the first progress report (this report) has been scheduled for submission at the end of one month of the study. The report is structured as follows; section 2 outlines progress achieved during the reporting period, while section 3 provides a summary of planned activities for the next reporting period (month 2).