Shop
- Hard Copy : Hard copy refers to the digital document file which is printed on paper or other material like transparency. In hard copy the output is printed on the paper and sometimes it is referred as permanent copy. We can touch the hard copy. We can say it is a physical copy.
- Soft Copy : Soft copy refers to the digital document file or electronic version of a document that is not printed on paper. We can not touch the soft copy. We can say it is a virtual copy.
Format: Soft Copy Product
National Water Master Plan Review-Institutions and Legislation Reform, Final Report, Volume No. 10 by Snowy Mountains Engineering Corporation (Pty) Ltd, March 2006.
Price
BWP140.00
Format: Soft Copy Product
Jwaneng Groundwater Exploration Programme by Wellfield Consulting Services- November 1978
Price
BWP140.00
Format: Soft Copy Product
Jwaneng Groundwater Exploration Programme, Volume 2- Maps and Figures by Wellfield Consulting Services
Price
BWP140.00
Format: Soft Copy Product
Serowe groundwater evaluation project low-altitude aerogeophysical interpretation- Final report- Swedish Geological Co.
Price
BWP140.00
Format: Soft Copy Product
Consolidated Village Water Supply Emergency Supply Programme Group II Villages; Molapowabojang, Rakhuna, Ngwatsau, Magoriapitse, Moakane; Final Report, Volume II- By Earth Resource Consultants (PTY) Ltd, February 1991
Price
BWP140.00
Format: Soft Copy Product
National Water Master Plan Review-Water Development Modelling Final Report, Volume No. 11 by Snowy Mountains Engineering Corporation (Pty) Ltd, March 2006.
Price
BWP140.00
Format: Soft Copy Product
Serowe groundwater evaluation report- 9th Progress report- 13 July- 12 August 1986- By Swedish Geological Co.
Price
BWP140.00
Format: Soft Copy Product
Report on the Geology and Hydrology of the Cave sandstone, Kweneng Block, Southern Botswana- April 1978
Price
BWP140.00
Format: Soft Copy Product
Serowe groundwater evaluation report- 10th Progress report- 13 August- 12 September 1986- By Swedish Geological Co.
Price
BWP140.00
Format: Soft Copy Product
Consolidated Emergency Programme Siting of Boreholes and Supervision of Drilling Construction for the Villages of Hatsa-la-Tladi, Sorilatholo, Malengwane, Dibete and Lephephe- By Earth Resources Consultants, May 1989
Price
BWP560.00
Format: Soft Copy Product
Serowe groundwater evaluation report- 11th Progress report- 13 September- 12 October 1986- By Swedish Geological Co.
Price
BWP140.00