Skip to main content

Shop

  1. Hard Copy :
  2. Hard copy refers to the digital document file which is printed on paper or other material like transparency. In hard copy the output is printed on the paper and sometimes it is referred as permanent copy. We can touch the hard copy. We can say it is a physical copy.
  3. Soft Copy :
  4. Soft copy refers to the digital document file or electronic version of a document that is not printed on paper. We can not touch the soft copy. We can say it is a virtual copy.
Format: Soft Copy Product
Northern Wellfield Monitoring Report 23, July to December 1991; Data Compilation- By Debswana Diamond Company
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 23, July to December 1991; Executive Summary- By Debswana Diamond Company variations
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 22, January- June 1991; Executive Summary- By Debswana Jwaneng Mine
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 22, January- June 1991; Data Compilation- By Debswana Jwaneng Mine
Price
BWP140.00
Format: Soft Copy Product
Evaluation of groundwater resources(GS10) Mmamabula groundwater resources investigation phase II- Khurutshe area- TB 10/2/3/90-91- Appendix No.3; Geophysical report- Annex 2- by Department of geological survey- 1994
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 36, January- December 2000; Data Compilation- By Debswana Diamond Company (PTY) Limited,13 June 2001
Price
BWP140.00
Format: Soft Copy Product
Feasibility/ Preliminary Design Study- Lower Shashe Dam, Final Report Vol. 3 by Snowy Mountains Engineering Corporation Cooma NSW Australia, April 1990.
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 37, January- December 2001; Executive Summary- By Debswana Diamond Company (PTY) Limited, 24 April 2002
Price
BWP140.00
Format: Soft Copy Product
Feasibility/ Preliminary Design Study- Lower Shashe Dam, Summary Report by Snowy Mountains Engineering Corporation Cooma NSW Australia, April 1990.
Price
BWP140.00
Format: Soft Copy Product
Feasibility/ Preliminary Design Study- Lower Shashe Dam- Environmental Impact Assesment, Inception Report by Snowy Mountains Engineering Corporation Cooma NSW Australia, October 1988.
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 37, January- December 2001; Data Compilation- By Debswana Diamond Company (PTY) Limited, 24 April 2002
Price
BWP140.00
Format: Soft Copy Product
Gaborone Water Supply Kolobeng and Metsimotlhabe Dams Project Site Investigations And Preliminary Engineering Studies- Final Report- June 1985
Price
BWP420.00