Skip to main content

Shop

  1. Hard Copy :
  2. Hard copy refers to the digital document file which is printed on paper or other material like transparency. In hard copy the output is printed on the paper and sometimes it is referred as permanent copy. We can touch the hard copy. We can say it is a physical copy.
  3. Soft Copy :
  4. Soft copy refers to the digital document file or electronic version of a document that is not printed on paper. We can not touch the soft copy. We can say it is a virtual copy.
Format: Soft Copy Product
Evaluation of groundwater resources(GS10) Mmamabula groundwater resources investigation phase II- Khurutshe area- TB 10/2/3/90-91- Appendix No.4: Recharge study- 1994
Price
BWP140.00
Format: Soft Copy Product
Gaborone Water Supply Kolobeng and Metsimotlhabe Dams Project Site Investigations And Preliminary Engineering Studies-Response To Comments On Final Report- September 1985
Price
BWP140.00
Format: Soft Copy Product
Feasibility/ Preliminary Design Study- Lower Shashe Dam- Water Consumption and Demand Estimates For An Integrated Supply System In Eastern Botswana, Discussion Paper by Snowy Mountains Engineering Corporation Cooma NSW Australia, November 1988.
Price
BWP140.00
Format: Soft Copy Product
Gaborone Water Supply- Master Plan, Pre-Investment Study- April 1988
Price
BWP140.00
Format: Soft Copy Product
Orapa Wellfields Groundwater Monitoring Report Number 11 for the Period December 30th, 1988- June 29th, 1989; Executive Summary- By A.L Shaw, et'al, August 1989
Price
BWP140.00
Format: Soft Copy Product
Evaluation of groundwater resources(GS10) Mmamabula groundwater resources investigation phase II- Khurutshe area- TB 10/2/3/90-91- Appendix No.3; Geophysical report- Annex 3- by Department of geological survey- 1994
Price
BWP140.00
Format: Soft Copy Product
Evaluation of groundwater resources(GS10) Mmamabula groundwater resources investigation phase II- Khurutshe area- TB 10/2/3/90-91- Appendix No.5; Assessment of the corrosion incrustation potential- by Department of geological survey- 1994
Price
BWP140.00
Format: Soft Copy Product
Report On Sub-Soil Investigations For Accelerated Land Servicing Programme
Price
BWP140.00
Format: Soft Copy Product
Selebi-Phikwe Temporary Water Supply Phase 2 Development, Report on design and execution of the proposed works- By Gibb Hawkins and Partners- May 1971
Price
BWP140.00
Format: Soft Copy Product
Southern Okavango Integrated Water Development- Sukwane Reservoir and Pipeline to Mopipi, Environmental Impact Study by Snow Mountains Engineering Corporation Cooma NSW Australia, November 1990.
Price
BWP140.00
Format: Soft Copy Product
Orapa Wellfields Groundwater Monitoring Report Number 11 from the Period December 30th, 1988, to June 29th, 1989; Technical Data- By A.L. Shaw, et'al, August 1989
Price
BWP140.00
Format: Soft Copy Product
Evaluation of groundwater resources(GS10) Mmamabula groundwater resources investigation phase II- Khurutshe area- TB 10/2/3/90-91- Appendix No.6; Groundwater flow modelling report- by Department of geological survey- 1994
Price
BWP140.00