Skip to main content

Shop

  1. Hard Copy :
  2. Hard copy refers to the digital document file which is printed on paper or other material like transparency. In hard copy the output is printed on the paper and sometimes it is referred as permanent copy. We can touch the hard copy. We can say it is a physical copy.
  3. Soft Copy :
  4. Soft copy refers to the digital document file or electronic version of a document that is not printed on paper. We can not touch the soft copy. We can say it is a virtual copy.
Format: Soft Copy Product
Botswana National Water Master Plan Study- Water Resources Modelling, Draft Final Report Volume 12 by Snowy Mountains Engineering Corporation Cooma NSW Australia, August 1990.
Price
BWP140.00
Format: Soft Copy Product
Francistown Water Development, Pre-Investment Study, Appendices C-Future Needs, Development of the water supply systems- September 1987
Price
BWP140.00
Format: Soft Copy Product
Francistown Water Development, Pre-Investment Study, Appendices B Water Resources- September 1987
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 24, January - June 1992- Executive Summary- By Debswana Diamond Company (PTY) Limited
Price
BWP140.00
Format: Soft Copy Product
Francistown Water Development, Pre-Investment Study, Appendix D-Phases 4,5 and Industrial Areas, Preliminary Study- September 1987
Price
BWP140.00
Format: Soft Copy Product
Botswana National Water Master Plan Study- Water Resources Modelling, Final Report Volume 12 by Snowy Mountains Engineering Corporation Cooma NSW Australia, February 1991.
Price
BWP140.00
Format: Soft Copy Product
Northern Wellfield Monitoring Report 24, January - June 1992- Data Compilation- By Debswana Diamond Company (PTY) Limited
Price
BWP140.00
Format: Soft Copy Product
Francistown Water Development, Pre-Investment Study, Appendices C-Future Needs, Water Demand Projections- September 1987
Price
BWP140.00
Format: Soft Copy Product
Botswana National Water Master Plan Study-Hydrogeology , Final Report Volume 5 by Snowy Mountains Engineering Corporation Cooma NSW Australia, March 1991.
Price
BWP140.00
Format: Soft Copy Product
Mmamabula groundwater investigation- phase II- Khurutshe area TB 10/2/3/90-91- Technical meeting No.4 Geophysics- 1993- by Department of Geological survey
Price
BWP140.00
Format: Soft Copy Product
Francistown Water Development, Pre-Investment Study- September 1987
Price
BWP140.00
Format: Soft Copy Product
Orapa Wellfields Groundwater Monitoring Report Number 15 for the Period January 1st, 1991, to June 30th, 1991; Executive Summary- By J.G. Gibson, et'al, September 1991
Price
BWP140.00