Skip to main content

Shop

  1. Hard Copy :
  2. Hard copy refers to the digital document file which is printed on paper or other material like transparency. In hard copy the output is printed on the paper and sometimes it is referred as permanent copy. We can touch the hard copy. We can say it is a physical copy.
  3. Soft Copy :
  4. Soft copy refers to the digital document file or electronic version of a document that is not printed on paper. We can not touch the soft copy. We can say it is a virtual copy.
Format: Soft Copy Product
The lands area water supply study TB 10/3/12/90-91- Interim report- Volume 1-1991
Price
BWP140.00
Format: Soft Copy Product
Water Resources Reconnaissance Of Lower Metsimotlhabe And Lower Notwane Rivers- July 1977
Price
BWP140.00
Format: Soft Copy Product
The lands area water supply study TB 10/3/12/90-91- Final report- Volume 1&2-1992- By Department of water affairs
Price
BWP280.00
Format: Soft Copy Product
Orapa Wellfields Groundwater Monitoring Report Number 12 for the Period June 30th, 1989, t0 December 29th, 1989; Technical Data- By J.G. Gibson, et'al, February 1990
Price
BWP140.00
Format: Soft Copy Product
Southern Okavango Integrated Water Development- Sukwane Dam And Pipeline To Mopipi Feasibility/ Preliminary Design Study- Final Study by Snowy Mountains Engineering Corporation Cooma NSW Australia, March 1991.
Price
BWP140.00
Format: Soft Copy Product
Study Of The Use, Extraction And Transfer Of Okavango Water, For Development Of The Okavango Corridor, Inception Report- By Swidish Consulting Group- December 1974
Price
BWP140.00
Format: Soft Copy Product
Orapa Wellfields Groundwater Monitoring Report Number 13 for the Period January 1st, 1990, to June 30th, 1990; Executive Summary- By J.G. Gibson, et'al, September 1990
Price
BWP140.00
Format: Soft Copy Product
Study Of The Use, Extraction And Transfer Of Okavango Water, For Development Of The Okavango Corridor, Interim Report- By Swidish Consulting Group- July 1975
Price
BWP140.00
Format: Soft Copy Product
Evaluation of groundwater resources (GS 10) Mmamabula groundwater resources investigation phase II- Khurutshe area TB 10/2/3/90-91- Appendix 2: Aeromagnetic Interpretation- 1992- by Departments of Geological survey
Price
BWP140.00
Format: Soft Copy Product
Evaluation of groundwater resources (GS 10) Letlhakeng- Botlhapatlou groundwater project TH 10/2/15/88-89- Appendix 2: Geophysical report- Annex 4- 1989- by Departments of Geological survey
Price
BWP140.00
Format: Soft Copy Product
Evaluation of groundwater resources (GS 10) Letlhakeng- Botlhapatlou groundwater project TB 10/2/3/90-91- Appendix 2: Geophysical report- Annex 5- 1989- by Departments of Geological survey
Price
BWP140.00
Format: Soft Copy Product
Orapa Wellfields Groundwater Monitoring Report Number 13 for the Period January 1st, 1990, to June 30th, 1990; Technical Data- By J.G. Gibson, et'al, September 1990
Price
BWP140.00